Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  •  d1. The construction project manager will provide CAD drawings in dwg format to the wireless team.
    •  PDF construction docs provided. No DWG files have been provided.
  •  d2. The construction project manager will schedule a meeting with wireless team to discuss rooms with 25+ seats, VIP areas, and ceiling material. This step should occur one to two weeks after d1.
    •  Discussed rooms, ceiling and mounting options with Charles.
  •  d3. The wireless team will create and provide predictive site survey for wireless access point (WAP) placements to construction project manager.  This step should occur one to two weeks after d2.
    •  AP placements and enclosure types were provided to Charles. He asked designers to incorporate them into the design.
  •  d4. The construction project manager will review and incorporate OIT Construction Standards.
    •  Construction_Standards_Final  > 27 21 33 Data Communications Wireless ACCESS POINTS > 3.01 EXECUTION
  •  d5. The construction project manager will provide updated CAD drawings with WAP placements to the wireless team.
    •  Updated construction docs have been provided in the form of BlueBeam link (PDFs). No DWGs have been provided yet.
  •  d6. The wireless team will verify placements and submit changes if needed to the construction project manager.

...